• Send Us a Message
  • 10% of all orders over £1000 - Use Code: DCD-B-F-10 at checkout

    The Fusion Plus 71/12P Display Cabinet On Legs features a modern aluminium design with a white frame, two shelves, and metal legs. Two white rectangular boxes are displayed on the middle and top shelves inside the cabinet.
    Two Fusion Plus 71/12P Display Cabinets On Legs stand side by side, each with lockable glass doors and adjustable shelves holding small brown boxes. A tall green plant is partially visible to the right in this modern setting.
    The Fusion Plus 71/12P Display Cabinet On Legs, with a lockable glass case and metallic legs, stands in a sunlit room. Inside are minimal accents: a white box, silver animal figurine, and starfish. Light from sheer curtains enhances its elegant look.
    A brown cardboard box with green stripes sits on a glass shelf inside the Fusion Plus 71/12P Display Cabinet On Legs, which features bright lighting and is surrounded by empty shelves.
    Two Fusion Plus 71/12P Display Cabinets on legs, each with adjustable shelves and lockable glass, house small brown lace-wrapped gift boxes. In the background, a tall green potted plant stands between the cabinets.
    The Fusion Plus 91/12P Display Cabinet On Legs, featuring lockable glass doors and adjustable shelves, showcases decorative items in a well-lit room with light wood flooring and steps leading to another inviting space.
    A modern museum gallery features Fusion Plus 91/12P Display Cabinets on legs with lockable glass doors and adjustable shelves, showcasing sculptures, pottery, and decorative art. The space has wooden floors and soft overhead lighting.

    Fusion Plus 71/12P Display Cabinet On Legs

    Product Code: FPM003A

    Regular price £955.00 Sale

    FREE DELIVERY(Mainland UK, excluding highlands)

    Dimensions: 71x120x37cm (WxHxD)

    Weight: 40kg

    Features

    Additional information

    • made to order
    • lead time:
      for orders confirmed between September and mid May - approximately 8-10 weeks
      for orders confirmed between mid May and August - approximately 12-15 weeks
    • Why are lead times longer between mid May and August?
      This cabinet is made at a factory in Italy that closes for most of the month of August each year, which adds 4-5 weeks to the lead time
    • please note: the delivery on these cabinets is a Tailgate delivery service. This means the delivery driver will bring the cabinet to the back of the delivery van but you would need to make arrangements to carry the cabinet from the van to your premises.
    • Custom colour, sizes and style available on request

    Specification

    • 5mm tempered glass